The Project
St Joseph’s is a school for ages 11-18 years in the Archdiocese of Cardiff. It is becoming increasingly popular for schools and other educational organisations to utilise modular buildings to provide more teaching space for their students. Especially during the COVID-19 pandemic, ensuring students could socially distance.
Application: Education
Location: Cardiff
System: Metal Modular Ramp
Client brief
In total three new modular classrooms were required, that were designed to be installed within the schools existing playground and games area. The three modular units were purchased by the school and formed into classroom units, with double door access.
Installation considerations
All modular ramp components for the 3 modular classroms were installed during 2 visits, over 3 working days.
Main requirements and features
- This access solution specified to be fully balustraded.
- 1100mm high rails installed at specified positions to provide additional safety and assurance.
- All level changes required 55mm highlight edges.
Project Summary
All works were completed within the required timescales. We were pleased to be able to offer our products and services to the team at St Joseph’s and it was a pleasure to work with them on this project and assist them in their plans to expand the school’s footprint.