Completed projects
Filter Projects By:
- All
- /
- Education
- /
- Events
- /
- Healthcare
- /
- Heritage
- /
- Modular Buildings
- /
- Public
- /
- Residential
Evonik, Clayton Lane, Manchester
Provide access to a new modular unit at Evonik’s office and depot in Manchester, Evonik are one of the world’s largest chemical companies. The client required ramped and stepped access to the new modular unit, which was designed to house offices and welfare facilities for their employees.
Fowler’s Yard, Durham
A building in Fowler’s Yard, Durham required a step unit that was situated within a conservation area. The site was not listed, but is within the Durham City conservation area and in the setting of the World Heritage Site. The existing staircase had to be removed and replaced with one our modular step unit. Although, all elements needed to be black.
Manchester Airport
Manchester Airport is an international airport at Ringway, south-west of Manchester city centre. In 2016, it was the third busiest airport in the United Kingdom in terms of passenger numbers and the busiest of those not serving London.
The Jewel Tower
The Jewel Tower dates back almost 650 years and is now a visitor attraction in the heart of Westminster. It was built around 1365 to house Edward III’s treasures and was known as the ‘King’s Privy Wardrobe’. One of only two buildings from the medieval Palace of Westminster to survive the fire of 1834, the tower has exhibition space over three floors, where visitors can learn of the Towers changing roles, see a model of the ‘lost’ medieval palace of Westminster, replicas of precious objects and a rare 14th century ribbed vault.
Royal Albert Edward Infirmary
This development at the Royal Albert Edward Infirmary in Wigan provided a permanent emergency Nightingale Ward, standing at 1,156 sqm. It was designed, manufactured, and completed on site ahead of schedule in less than 40 days, during the height of the COVID-19 outbreak.
St Joseph’s High School
St Joseph’s is a school for ages 11-18 years in the Archdiocese of Cardiff. It is becoming increasingly popular for schools and other educational organisations to utilise modular buildings to provide more teaching space for their students, therefore access was required for these modular building additions.
Newcastle General Hospital
This development at the Newcastle General Hospital, Campus for Ageing and Vitality provided a temporary Ophthalmology unit for the treatment and prevention of diseases of the eye.
Clients
We are so proud of the work we have achieved working along side…
Contact
Request a free survey and quote or discuss what product and service is best for you.
Make Enquiry